The project required the demolition of an old roof system and the installation of a new one followed by a structural roof platform, new HVAC system of AHU’s and associated internal works and internal fit-out to theatres.
All works were carried out above live theatre rooms. To mitigate risk of water ingress during the project the building was shrouded with a temporary, fully weathered tent structure. This was an intricate scaffolding design due to the hospital being a listed building with no tie-ins allowed.
Particular emphasis was placed on dust, noise and vibration control with daily monitoring required for each. Aspergillus being a high concern for the working hospital environment.