A hotbed for innovation
The Robinson comprises 458 new homes across three blocks ranging in height from 10 to 21 storeys and will be complete in summer 2021.
Sisk used slip form concrete on the site, a method which involves concrete being poured into a continuously moving form, allowing contractors to build vertically. The technique was used on two concrete cores, one of which at 22-storeys high.
Wembley taxi lift
The Sisk team lifted hundreds of thousands of items in the construction of E05 but one of the most unique lifts was to see a refurbished London black cab hovering along the skyline at Wembley.
The black cab was refurbished by Dub Box to designs by Fossey Arora. This black cab now serves black coffee on the roof top terrace of The Robinson.
Off-site construction
Sisk selected a precast concrete architectural façade with a composite window solution. This was the first time that architectural precast panels have been used at Wembley Park.
The panels reduced the time spent constructing the façade on-site, removing the need for scaffolding, providing enhanced quality control and reducing the volume of labour on site.
Over 1,600 panels were manufactured off site before being installed via a crane at the E05 plot.
Pre-hung door sets
Windows precast off-site
Brick faced precast façade panels
pre-fabricated bathroom pods off-site
Digital technology
Sisk has invested significantly to provide its project delivery team with the right tools and knowledge to get the best out of BIM and digitisation. This has been driven through its Digital Project Delivery (DPD) approach.
By using 4D planning as a virtual construction rehearsal tool, Sisk has managed its programmes much more effectively
Sustainable solutions are at the heart of The Robinson
CN Awards 2022
locals employed
apprentices hired
local apprentices hired
India Covid relief fund
The Sisk team at The Robinson hosted a BBQ to support Covid Relief work in India launched by BAPS Swaminarayan Sanstha, an international UN-affiliated charity.
Furthermore Sisk set-up a fundraising page where Sisk and our supply chain partners generously supported to reach £8,000.
Bug hotel
Alongside our drylining partners Platt Reilly, the Sisk site management team constructed a bug hotel. This now has a permanent home in the landscaping of Wembley Park.
Coffee grounds
Our E05 team partnered with their canteen company to give used coffee grounds to staff, so they could bring them home for use in their gardens.
In addition to reducing waste, used coffee grounds make great fertiliser or can be used in a compost pile.