In November 2021, Sisk completed Alexandra Road Bridge at Dublin Port. The project involved the construction of a 150m long, 13m wide two-lane vehicular bridge with access ramps over Alexandra Road connecting the CDL yard and Terminal 4.
In November 2021, Sisk completed Alexandra Road Bridge at Dublin Port. The project involved the construction of a 150m long, 13m wide two-lane vehicular bridge with access ramps over Alexandra Road connecting the CDL yard and Terminal 4.